Kelly Johnson and the Skunk Works

How a small team with clear rules and real authority built America's first operational jet fighter in 143 days.

In June 1943, the U.S. Army Air Forces had a jet engine and no American airplane to put it in. Britain had built a working turbojet, the Halford H-1, later called the Goblin. Germany was known to be developing jet aircraft of its own. The United States had nothing comparable in production, and the war would not wait for the normal pace of aircraft development. The Army went to Lockheed in Burbank, California, and asked a hard question: could a company already buried in wartime orders design and build a jet fighter prototype in a matter of months?

The man who said yes was Clarence "Kelly" Johnson, Lockheed's young chief research engineer. He had earned two aeronautical engineering degrees at the University of Michigan in the early 1930s, and while still a student working in the school's wind tunnel he had challenged a professor's assessment of a Lockheed airliner's stability and been proven right. Johnson promised the Army a prototype in roughly six months. The trouble was that Lockheed had no space and no spare people. Every hangar, drafting table and mechanic was already committed to airplanes the Army needed right now.

So Johnson built a place that did not exist. Next to the company wind tunnel, his team put up a temporary shop of about 11,000 square feet, walled with engine shipping crates, scrap lumber and canvas, and roofed with a rented circus tent. He pulled together a small, hand-picked group of 23 engineers, with shop mechanics added as the work grew. They worked ten-hour days, six days a week. The secretive operation picked up its name almost by accident, when engineer Irv Culver began answering the phone with a reference to the "Skonk Works" in the Li'l Abner comic strip. The name stuck.

What happened inside that tent was less about genius than about how decisions were made. Johnson kept the team small enough that everyone knew what everyone else was doing. Engineers worked within shouting distance of the people building the parts, so a problem on the shop floor could be fixed on a drawing the same afternoon. One person had the authority to decide, and that person was in the room. Drawings were kept simple and easy to change, and paperwork was kept to what actually mattered.

Design work on the airframe started on June 26, 1943. The first XP-80 was delivered to Muroc Army Airfield in the California desert 143 days later, ahead of the deadline Johnson had promised. Test pilot Milo Burcham took it up for the first time on January 8, 1944. The airplane became the P-80 Shooting Star, the first operational jet fighter in the U.S. inventory. It is worth being honest about the timing: the P-80 arrived too late to fight in World War II, and only two pre-production aircraft reached Italy before the war in Europe ended. It did see heavy use in the Korean War, and more than 1,700 single-seat versions were built by 1950.

Over the following decades, Johnson wrote down the way he ran the Skunk Works in fourteen rules. None of them is about aerodynamics. The program manager gets real authority and reports high in the company. Project offices on both the customer's side and the builder's side stay small and strong. The number of people touching the project is restricted hard, using a fraction of what a normal program would assign. Drawings stay simple, reports stay short, and costs are reviewed every month so nobody is surprised. Specifications are agreed in advance. Funding arrives on time. The customer and the builder work in close trust. And good performance is rewarded with pay that does not depend on how many people you supervise.

He boiled it all down to a motto that is still associated with him: "Be quick, be quiet, and be on time." The same approach produced the U-2 reconnaissance plane for the CIA, which first flew in August 1955, less than nine months after the project got the go-ahead, and reportedly came in about $3.5 million under its $22.5 million contract for the first 20 aircraft. It produced the A-12 and the SR-71 Blackbird, titanium aircraft that cruised above three times the speed of sound and set records that held long after the SR-71 retired in 1998. Johnson led the Skunk Works for decades and died in 1990.

Johnson was candid that his rules were simple and rarely followed. Organizations admired the results and then added the layers of review and headcount that the rules were written to prevent. He noted that running a project this way took management confidence and "considerable courage." That is the part people skip. Giving a small team real authority means a leader has to trust people to make decisions he will not see in advance, and has to resist the urge to add one more approval just to feel safe.

There is an honest limit here too. Secrecy and speed are the right tools for some jobs and the wrong tools for others. A team that operates quietly can also hide its mistakes from the people who most need to see them. Johnson's rules worked because they paired autonomy with discipline: monthly cost reviews, agreed specifications, records of the important work. Freedom without those checks is not a Skunk Works. It is just a team nobody is watching.

You probably do not run a secret aircraft program, but you almost certainly run work that has grown more people, more meetings and more sign-offs than it needs. On Monday, pick one project and ask how many people actually have to touch it. Name one person who can decide, and make sure that person sits close to the work. Write down your own rules for how the team operates, on a single page, and then defend those rules when someone tries to add a layer.

Then do the hard part, which is trusting the small team you built. Give them the authority to fix problems the same day they find them. Review the money and the schedule on a regular rhythm so trust never has to mean blindness. Reward the people who deliver, not the people who collect the biggest headcount. Kelly Johnson did not have more talent than the rest of the industry. He had fewer people, clearer rules and the nerve to let them work. That is how a circus tent beat a war-sized bureaucracy to the deadline.

The takeaway: Small teams with clear rules and real authority outrun big teams with layers of approval. Your job is to keep the team small, keep the rules visible and trust the people you chose.

The discipline

This story is a picture of Own It, Chapter 2 of The Real Leader. Fear gets compliance. Trust gets commitment. This is what commitment looks like.

Read Chapter 2 in The Real Leader →

Share the lesson

Leading through something like this?

Describe your situation and get the diagnosis, the principle, and the exact words to say tomorrow.

Get counsel, free →
← All storiesNext story: Joe Sutter and the Boeing 747 →
Sources